Provide dredging of tailing of ponds at the “Old Hickory” and “Concord” plants. Installed and welded pump pipe. Cleared right of ways and built support/access roads. Maintained and swept roads using self-contained sweepers.
Assisted in mobilization of mining units and equipment. Repaired dikes, mowed grass/ditches with side mower. Performed reclamation work as well as repair of field drainage and installation of silt fence/erosion control. Screened topsoil as needed.